News

Another tunnel section opened by Eurotunnel
29 September 2008

Eurotunnel announced today (29 September) that it has opened another new section of the Channel Tunnel, enabling a further increase in traffic following the fire that occurred on 11 September.

The reintroduction of interval four, which is the middle section of the north tunnel, means that five of the six intervals that comprise the Channel Tunnel are now operational.

Interval four's opening follows the restart of services in the south tunnel on 13 September and the resumption of operations in the first part of the north tunnel on 22 September.

A boost in departure frequency will mean that traffic can now depart every 90 minutes, rather than every two hours.

From 1 October, capacity will be raised from 170 trains per day to 210.

People travelling on Eurostar services will now see almost 100% of normal capacity become available, with the new interval allowing the operator to use between 55 and 58 paths per day.

Passengers should be aware that Eurostar is planning a modified timetable in order to best utilise the capacity available through the Channel Tunnel.

Opodo travel, hotels and car hire - let the journey begin!ADNFCR-408-ID-18802120-ADNFCR


Back to news homepage




Customer Service 0871 277 0090. Calls charged at 10p per minute for BT customers. Charges on other networks may vary. Hours: Mon - Fri 08:00 to 20:00, Sat and Sun 09:00 to 14:00.
Whether you're looking for cheap car rental in BarcelonaMalagaLas VegasSydney, or Paris, or cheap flights to AustraliaCyprusFranceItalyIrelandSpainTurkey, the USA and more, Opodo can help. Look out for our holidays to CanadaCubaDubai, the Dominican RepublicEgypt and Mexico. Stay in the loop with Opodo's travel news.
Payment methods: Visa / MasterCard / American Express / Switch / Delta.